Previous Next


Discovery Gas Transmission LLC
FERC Gas Tariff
Original Volume No. 1
Search

Original Sheet No. 198A

			            d.    Construction modifications and repairs of pipeline shore 
                  approaches, levee crossings and other water/land interfaces 
                  including pipeline modifications, burials and matting 
                  (including but not limited to the removal of restrictions or 
                  obstructions; recoating, repairing, relocating or replacing 
                  lines of pipe or equipment; improvements of fencing and 
                  physical barriers; engineering support; and activities 
                  required by governmental agencies with jurisdictional 
                  authority over facilities or activities of the System and 
                  rights-of-way); and

            e.    Post-hurricane (or Natural Disaster) inspections not covered 
                  by insurance (including but not limited to inspections from 
                  helicopters, remote-operated vehicles and dive boats; sonar 
                  surveys and hydrostatic testing or other assessments; 
                  engineering support; and additional inspections required by 
                  governmental agencies with jurisdictional authority over 
                  portions or activities of the System and rights-of-way).

      27.3  EFFECTIVE DATE AND FILING OF HMRE SURCHARGE -

            a.    The effective HMRE Surcharge shall be shown on Transporter's 
                  Tariff Sheet No. 20. The effective date of each HMRE 
                  Surcharge shall be January 1 of each year.

            b.    Subsequent to the initial filing implementing Transporter's 
                  HMRE Surcharge, Transporter shall file with the Commission 
                  (at least thirty (30) days prior to the effective date of 
                  the new HMRE Surcharge but no later than November 15) and 
                  post, as defined by Section 154.2(d) of the Commission's 
                  Regulations, the HMRE Surcharge with supporting 
                  documentation. With respect to the adjustment described 
                  herein, such filing shall be in lieu of any other rate 
                  change filing required by the Commission's Regulations 
                  under the Natural Gas Act and shall not be suspended beyond 
                  the next December 31. With each such filing, Transporter 
                  shall include a detailed written description of all 
                  Qualifying HMRE Expenditures in its filing (except for any 
                  expenditure carried forward from a prior filing), with an 
                  explanation of how each such expenditure qualifies for 
                  inclusion in the HMRE Surcharge in accordance with Sections 
                  27.1 and 27.2 above. Subject to approval by the Commission, 
                  Transporter may seek confidential treatment of any portion 
                  of the filing.
			

Issued by: Kevin R. Rehm, Vice President
Issued on: March 6, 2008                      Effective on: January 1, 2008
Previous Next